Thursday, 26 March 2015

Major events in Boiler Commissioning


1. BOILER COMMISSIONING.
2. OBJECTIVE: It is a systematic procedure used after completion of erection in making the Boiler and its auxiliaries available for safe, smooth and reliable Operation.
3. Major events in Boiler Commissioning 01.Air leakage test. 02.Hydro testing of boiler. 03.Readiness of Boiler auxiliaries. 04.Gas distribution test. 05.Boiler

Purpose of steam blowing

Cleaning by steam blowing is carried out essentially for steam circuits (i.e for steam generating boilers, steam heated exchangers, steam turbine upstream piping or other steam lines). Due to problems of condensation of steam or draining of condensate, this type of cleaning has to be used with the utmost care, as it can pThe purpose of blowing or cleaning the steam lines prior to starting up a new unit is to remove